Client Miami Dade County

Type

Statues Complete

Location 6800 SW 87th Ave Miami, Florida 33173

This project involved specialty construction work within the Alexander Orr Water Treatment Plant, requiring careful coordination in an active operational facility. The scope focused on the restoration and integration of architectural elements, including the installation of a custom glass wall system. Red Door Construction worked closely with project stakeholders to ensure all work was executed without disrupting ongoing plant operations.

Scope of Work
• Installation of architectural glass wall systems
• Restoration and integration of existing structural elements
• Coordination within an active municipal facility
• Precision alignment and installation of specialty materials
• Interface with mechanical and operational systems on site

Key Features
• Custom glass wall installation utilizing existing elements
• Work performed within an active infrastructure environment
• High level of coordination with facility operations
• Integration of new construction with existing conditions

Construction Challenges
Working within a fully operational water treatment facility required strict adherence to safety protocols, scheduling constraints, and coordination with plant personnel. Limited access and the need to protect existing infrastructure required detailed planning and controlled execution.

Outcome
The completed work successfully integrates new architectural elements within the existing facility, improving the visual and functional quality of the space while maintaining uninterrupted plant operations.