Client City of Coral Gables
Type Historic Preservation
Statues Completed
Location Coral Gables, Florida
Red Door Construction completed infrastructure and restoration work across seven plazas and thirteen fountains for the City of Coral Gables. The project focused on upgrading underlying systems while preserving and replicating key architectural elements, requiring a coordinated approach between construction, restoration, and specialty fabrication.
Scope of Work
• Installation of new infrastructure across multiple plazas and fountain systems
• Waterproofing of fountain structures and plaza surfaces
• Restoration and conservation of existing stone elements
• Reconstruction and detailing of fountain components
• Replication of trellis structures based on original designs
• Fabrication and replication of wood elements
• Integration of new systems within existing historic environments
• Coordination with municipal and preservation requirements
Key Features
• Multi-site project spanning seven plazas and thirteen fountains
• Combination of infrastructure upgrades and historic restoration
• Stone conservation and detailed restoration work
• Custom replication of architectural trellis and wood elements
• Waterproofing systems designed for long-term durability
Construction Challenges
The project required coordination across multiple active public sites, each with unique conditions and restoration requirements. Balancing infrastructure upgrades with preservation of historic elements demanded careful planning and execution. Replicating architectural features required precision to match original design intent while meeting modern performance standards.
Outcome
The completed work enhances the functionality and longevity of the plazas and fountain systems while preserving the architectural character of the spaces. Through disciplined coordination and execution, Red Door Construction delivered a comprehensive infrastructure and restoration project for the City of Coral Gables.











